Ariane 4 · Flight Program
Ariane 4 Flight Program
ESA/Arianespace Ariane 4 commercial workhorse flight program.
- Total Flights116116 flown · 0 queued
- Success Rate97%113 of 116 flown
- First Flight1988-06-15Program debut
- Last Flown2003-02-15Latest orbital flight
- Cadence47dAvg interval
- Longest Gap179dMax interval
Flight sequence
Showing latest 6 of 116 completed flights

Program statistics
Derived from catalog flight memberships (shared with AI evidence).
- Total launches
- 116
- Scheduled (future)
- 0
- Past flights
- 116
- Success
- 113
- Failure
- 3
- Partial
- 0
- Flights (last 365d)
- 0
- Avg interval
- 47 d
- Longest gap
- 179 d
- First NET
- Last NET
Launch history
- Development status
- Completed commercial service
- First flight
- 1988-06-15
- Last flight
- 2003-02-15
- Total flights (catalog)
- 116
- Successes (catalog)
- 113
- Failures (catalog)
- 3
- Partial (catalog)
- 0
- First NET (catalog)
- Last NET (catalog)
Ariane 4 Flight Program Program Intelligence & FAQ
Verified mission answers, architecture breakdowns, and flight preparations.
History & ContextWhat was the Ariane 4 flight program?
The Ariane 4 flight program was Europe's primary commercial launch campaign between 1988 and 2003. Operated by Arianespace from the Guiana Space Centre ELA-2 pad, it achieved 116 launches with 113 successes, launching over 180 satellites and establishing Europe as the world's leading commercial launch provider.
Mission ArchitectureWhat variants flew under the Ariane 4 program?
Ariane 4 utilized a modular booster architecture with six distinct variants: AR40 (unboosted), AR42P and AR44P (two or four solid strap-ons), AR42L and AR44L (two or four liquid strap-ons), and AR44LP (two solid, two liquid strap-ons), tailoring lift capacity precisely to commercial GTO payloads.
Campaign Milestone Roadmap
Ariane 4 Flight Program strategic flight campaign and mission architecture phases.
- Phase 01CompletedMarch 1996
Commercial Workhorse Era (1988–2003)
Modular medium-to-heavy commercial satellite launch campaign from ELA-2
Primary ArchitectureAriane 40· Baseline (no strap-ons)Ariane 42P / 44P· Solid booster strap-onsAriane 42L / 44L / 44LP· Liquid and mixed booster strap-onsFlight Dossier →Key Objectives
- Inaugural flight V22 on June 15, 1988 with Meteosat-3 and PanAmSat-1
- Establishment of Europe's global commercial launch market leadership
- Completion of 116 flights (113 successful) until retirement in February 2003
Living knowledge
Generating living knowledge… this can take several minutes.
Launch Comparison Studio
AI SummaryCompare technical configurations, launch pads, vehicles, and mission outcomes between any two launches.

